Hawlec were appointed as the Electrical Contractor for this superbly constructed New & Partially Refurbed Care Home in Tallington. Phase 1 consisted of a brand new 31 Bed home to cater for all needs including Hair Salon, Orangery & a number of Day space areas. Phase 2 of the project was to refurb the existing home and a number of additional extensions including a cafe & pub area.
Working closely with MV Construction, Designers & Architects we met all requirements and visions of the end client to enable them to give the best possible environment for their residents.
The installation consisted of:
- Small Power Installations
- LED Lighting
- Fire Detection Systems
- Disabled Refuge Systems
- Nurse Call Systems
- Access Control Systems
- Mechanical Wiring
- CCTV Installations
- Data, TV & Communications
- Induction Loop Systems
- Distribution Boards & Panels
Project stats
Location:
Tallington
Duration:
12 weeks
Client:
MV Construction